450 m long concourse and 450 m long rail level of Surat HSR station has been completed

The first slab at Surat HSR station was cast on 22nd Aug 2022 and the last slab casting completed on 21st August 2023, i.e. within a period of one year, both concourse and rail level slab casting is completed.

Salient features:

  1. Dimensions of the concourse level- 37.4 m x 450 m (comprising 9 slabs)
  2. Quantity of concrete used– 13,672 Cum
  3. Steel Reinforcement Used- 2785.43 MT